ATTENTION:
BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420
WHATSAPP US ON 08137701720
IDENTIFICATION AND ASSESSMENT OF THE EFFECTIVE FACTORS ON THE OCCURRENCE OF THE ENVIRONMENTAL EVENTS CAUSED BY THE CONSTRUCTION AND OPERATION OF GAS AND STEAM POWER PLANTS (CASE STUDY: MAPNA GROUP)
Background and Objective:
One of the major consequences of incidents in today’s industries, especially those associated with high quantities and a wide range of chemicals, is the widespread environmental degradation. Therefore, identifying the effective factors in the occurrence of incidents and analyzing the complex interrelationship between them is an important and fundamental topic in accident analysis and a way of preventing them from occurring. Materials and Methods: The present research was a descriptive-analytic study that aimed to analyze the environmental events occurring in the MAPNA group (Iran Power Plant Project Management). The main tool for the analysis of selected environmental incidents was the Tripod Beta technique, which identifies the causes of events at three levels of obvious causes, pre-conditions, and hidden causes. Results: In the current study, out of 96 analyzed accidents, 533 pre-conditions and 1,592 hidden causes were identified. Of all the hidden causes, the subject of repair and maintenance management had the highest frequency. In addition, among the identified hidden causes, the most important cause was inadequate specifications and equipment-related requirements. Conclusion: Emphasis on the amelioration of the hidden causes by taking into account the system lifecycle, focusing on the promotion of the safety levels in the design phase, as well as regarding the importance of adopting appropriate risk-based maintenance and repair strategies, were the main suggestions of the present study.
HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420