ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

ECONOMIC ANALYSIS OF DRY-SEASON IRRIGATED TOMATO PRODUCTION IN BOMO VILLAGE-ZARIA

ABSTRACT

The importance of tomatoes in supplementing vitamins A and C deficiencies in most of the developing countries can not be overemphasised. A crucial role it plays in the economies of most developing countries can be looked at in terms of rural employment, source of raw material for industries and source of food for the people. The specific problem is that of lack of information for economic evaluation of tomato production under the small scale irrigation in Bomo Village. The thesis describes the small scale surface irrigation farming system in Bomo with respect to resource use, existing production method and output. It also determines the net farm incoeme from tomato production and it estimates the input-output relationship of tomato enterprise under the irrigation system. Thirty farmers were interviewed in the study area. The farm budget model was used to determine the net farm income and the production function model was used in estimating the input-output relationship. The Results showed that inputs were relevant in explaining the variations in the output. The marginal value product of fertilizer and irrigation labour were higher than their marginal factor costs; while the marginal value product of family labour was less than its marginal factor cost. This implies that less of irrigation labour and fertilizer were used than required at the optimum profit point. The increase in the use of irrigation labour input will therefore result in attainment of higher output in the study area.

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *