ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

DEFECTS IN BUILDING COMPONENTS, CAUSES, EFFECTS AND REMEDIES

Abstract

This work discusses defects in building components, causes, effects and remedies. Building collapse is usually an outcome of progressive deterioration of the various components forming the building unit. This paper identified and assessed the nature and sources of both the generic and specific causes of defect of building components in Nigeria. Edo State was purposively sampled for the study. Data were obtained through use of a structured questionnaire, and results were analysed using a relative importance index. Analysis showed that building components tend to fail at different rates depending on the materials, designs, method of construction, environmental conditions and the use to which the building is put. Substandard materials and design errors were identified as major causes of component defect. The specific causes of defect of building components, apart from substandard materials and design errors, relate primarily to construction method and the use of the various components.

TABLE OF CONTENT:

CHAPTER ONE

INTRODUCTION

1.1     Background of the Study

1.2     Statement of the Research Problem

1.3     Objectives of the Study

1.4     Significance of the Study

1.5     Research Questions

1.6     Research Hypothesis

1.7     Conceptual and Operational Definition

1.8     Assumptions

1.9     Limitations of the Study

CHAPTER TWO

LITERATURE REVIEW

2.1     Sources of Literature

2.2     The Review

2.3     Summary of Literature Review

CHAPTER THREE

RESEARCH METHODOLOGY

3.1     Research Method

3.2     Research Design

3.3     Research Sample

3.4     Measuring Instrument

3.5     Data Collection

3.6     Data Analysis

3.7     Expected Result

CHAPTER FOUR

DATA ANALYSIS AND RESULTS

4.1     Data Analysis

4.2     Results

4.3     Discussion

CHAPTER FIVE

SUMMARY AND RECOMMENDATIONS

5.1     Summary

5.2     Recommendations for Further Study

References

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *