DESIGN AND INSTALLATION OF PHOTOVOLTAIC POWER SYSTEM (A CASE STUDY OF A ROOM AND PARLOR SELF CONTAIN IN OKE-OSE, ILORIN KWARA STATE)
ABSTRACT
This research work is based on the design and installation of photovoltaic power system. A room and parlor self contain at Ara village Kwara state was used as a case study. A total load of 740 watts a total wall hour capacity of 5840wh and total battery bank 1474.75Ah all was determined during the sizing of the apartment under study. The cost of using a diesel generator and electric from the public utilities (national grid). The result shows that after 1 year and 8 month, the cost of using diesel generator will be equal to the amount spent on photovoltaic system, also after 8 year 1month, the cost of using electricity from public utilities (national grid) will be equal to the amount spent on photovoltaic system.
TABLE OF CONTENT
Title page i
Certification ii
Dedication iii
Acknowledgment iv
Abstract v
Table of content vi
CHAPTER ONE
1.0 Introduction 1
1.1 Renewable energy 1-6
1.2 Renewable energy for heating 6
1.3 Renewable energy for transport fuel 7-8
1.4 Aim & objectives of the study 8-9
CHAPTER TWO
2.0 Photovoltaic (PV) 10-12
2.1 Solar cells 12-13
2.2 Materials uses for photovoltaic 14-16
2.3 Photovoltaic systems 16
2.3 Photovoltaic module 17
2.5 Photovoltaic energy 18-19
2.6 Working of pv cell 19-21
CHAPTER THREE
3.0 Materials and methods 22
3.1 Specification of the appliances 22
3.1.1 Photovoltaic module (PV) 23
3.1.2 Charger controller. 24
3.1.3 Battery 24
3.1.4 Inverter 25
3.2 Sizing 25-28
3.3. Choice of components for solar energy
power supply for 740 watt load 29
3.3.1 Solar panel 29
3.3.2 Charger controller 29-30
3.3.3 Battery capacity 30
CHAPTER FOUR
4.0 Life cycle analysis 31
4.1 Cost of diesel generator (740w) 31-33
4.2 Cost of using electricity (740w) 32-33
4.3 Cost of installing solar powered PV system 33
4.4 Cost analysis 34-35
CHAPTER FIVE
5.0 Conclusion and recommendation 34
5.1 Conclusion 36
5.2 Recommendation 37-38
Reference 39-40
HOW TO RECEIVE PROJECT MATERICAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420
http://graduateprojects.com.ng/